Ship log
What has shipped on this site, newest first. Taken from the repository's commit history.
Feature pass: project links on /tech-stack, generated per-project social cards, a colophon, deep-linkable case-study highlights, and a filter over the stack.
Motion pass: the header marks the current route, the hero and the project cover animate in on navigation, and the home page gained a scroll-progress bar.
Developer-experience pass: the e2e suite builds itself, malformed post frontmatter fails the build, and the unused framer-motion dependency is gone.
Performance pass: the 298 KB animated GIF became a 108 KB animated WebP, the 21 tech icons moved to this origin, and the optimizer was switched on for AVIF.
Motion pass: one shared timing module, reveal start states applied in a layout effect, and reduced-motion coverage extended to every animated surface.
Accessibility pass: one main landmark per route, post titles as headings, a pause control on the tech marquee, and contrast fixes on the focus ring and CTA.
Ran a read-only audit of the whole repository and recorded it as a phased roadmap.
Added the sword-glint theme transition, the gallery deck and page transitions.
Rebuilt the home page around the stacked photo cards and the canvas pixel-sweep avatar.
Deployed to rajex.my.id.
Added the project detail and MDX blog routes, with a sitemap and robots.txt.
Scaffolded the site: Next.js 16 App Router, Tailwind 4 tokens from DESIGN.md, the shell, and the first home sections.